Sale!

microware HDMI Cable 1.5 m 1.5 Meter HDMI Cable HIGH SPEED Long Lead with Ethernet ARC Full HD 1080p PS4 Xbox One Sky HD TV Black & Gold Plated(Compatible with desktop, laptop, smart tv, dvr, projector, Black)

Check Price on Amazon

SKU: 686369 Category:

Additional information

Weight 0.5 kg
Brand

microware

Type

HDMI Cable

Cable Type

1000 Mbps Speed

Connector 1

HDMI Male

Connector 2

hdmi male

Cable

Round

Part Number

mmpl 123

Model

1.5 Meter HDMI Cable HIGH SPEED Long Lead with Ethernet ARC Full HD 1080p PS4 Xbox One Sky HD TV Black & Gold Plated

Compatible Devices

TV, Computer, Gaming Console

Color

Black

Suitable For

desktop, laptop, smart tv, dvr, projector

Cable Length

1.5 m

Reviews

There are no reviews yet.

Be the first to review “microware HDMI Cable 1.5 m 1.5 Meter HDMI Cable HIGH SPEED Long Lead with Ethernet ARC Full HD 1080p PS4 Xbox One Sky HD TV Black & Gold Plated(Compatible with desktop, laptop, smart tv, dvr, projector, Black)”

Your email address will not be published. Required fields are marked *